iCertifi and iCertifi Cloud Pro

The details they ask for. On one extra page.

Additional information is an optional page printed at the end of your EICR, EIC, Domestic EIC and Minor Works certificates. It holds the job numbers, landlord steps, agent details and notes that customers, landlords and agents ask for, and that the official certificate has no box for. The official BS 7671 pages never change.

  • You choose the sections. Switch on only what your jobs need, in Settings.
  • Filled in on each job. It is the last page of the certificate form, and any section can be left off a single job.
  • Nothing switched on, no extra page. Your certificates print exactly as they do today.
Download iCertifi on the App Store

In iCertifi and in iCertifi Cloud Pro, on iPhone and iPad.

Printed Additional information sections from iCertifi: job no., client PO no., UPRN, site contact, letting agent, what the landlord must do next in England, equipment checks and notes

A printed Additional information page. The details shown are examples.

What goes on the page

Six sections. Use the ones you need.

Each section prints with its own numbered heading. A section you switch off is left out, and the rest move up.

Job details

Job no., customer PO no., property ref or UPRN, site contact with their phone number, and access notes such as a key safe.

Repairs doneEICR only

Each C1, C2 and FI item with the certificate that fixed it, or Done by others. Prints on the Remedial Works Record with a signed statement.

Landlord next stepsEICR only

What the landlord must do with the report, and by when, for England, Wales or Scotland.

Agent and inspector

The letting agent’s name, address and email, and your qualifications. Choose a saved agent instead of typing it again.

Equipment checks

For housing association homes: whether the equipment checks are up to date, with notes.

Notes

Your own words, such as payment terms or a guarantee. Set your usual notes once in Settings.

How it works

Switch it on once. Fill it in on each job.

1

Switch on the sections

Go to Settings, then Additional information under Extra certificate page. Switch on the sections you want and choose the landlord rules for England, Wales or Scotland.

Add your qualifications and your usual notes once. They are filled in on each new certificate while Agent and inspector or Notes is on. Certificates made before you switch a section on stay exactly as they were.

Additional information in iCertifi Settings on iPad: Job details, Repairs done, Landlord next steps, Agent and inspector, Equipment checks and Notes switches
2

Fill it in on the certificate

Additional information is the last page of the EICR, EIC, Domestic EIC and Minor Works forms. Type the job details, choose a saved agent and add any notes. Not needed on this job? Switch the section off, and it is left off this certificate only.

The Additional information page on an EICR in iCertifi on iPad: switches for this certificate and the Job details card
3

It prints at the end

The page prints after the official certificate, in your certificate colour, with your business name and the certificate reference at the top.

A blank answer keeps a line free, so it can be written in by hand. When Landlord next steps is on, the page also shows the regulation the landlord duties come from.

Printed Additional information page at the end of an EICR from iCertifi: job details, agent and inspector, landlord next steps for Wales, equipment checks and notes

Wales shown. The details are examples.

Repairs done, on EICRs

From the observation to the Remedial Works Record.

Every C1, C2 and FI observation on the EICR is listed with the certificate for the work and the date it was finished. The landlord sees what was fixed, by which certificate, and what is still to do.

The Electrical Installation Remedial Report page from iCertifi, unchanged
Page 1: the Electrical Installation Remedial Report, unchanged.
Remedial Works Record from iCertifi listing each C1, C2 and FI item with the certificate for the work, the signed statement and what the landlord must do next in England
The next page: each item, the certificate for the work, the signed statement and the landlord’s next steps. The names shown are examples.
4

Each repair links to its item

Make the repair certificate from the observation with Certificate for this repair, and it is linked to that item for you. The item shows as done once the repair certificate has its completion date.

Fixed with a certificate you made earlier? Tap Link on the item, choose Link a certificate and pick the one that fixed it. Repaired by someone else? Choose Done by others.

The statement under the list is ticked for you: the electrical safety standards are met when every item is done, or further investigative or remedial work is required while any is left. The person who did the work signs it.

Which certificate fixed it: linking an EICR item to its repair certificate in iCertifi on iPad

Repairs due

When an England EICR using Repairs done still has items to do, a Repairs due button appears on the Retests due screen. It lists each one with its last day, 28 days starting with the inspection date, and overdue dates show in red.

Send landlord pack

On the EICR’s PDF, Share then Send landlord pack emails the report and, when repairs are listed, the Remedial Works Record. It is addressed to the agent’s email if you typed one, and when Landlord next steps is on, the email lists them too.

Job numbers to Mint Books

The job no. and the customer’s PO no. go to Mint Books with the certificate, so they are ready for the invoice.

Landlord next steps

The landlord’s duties, printed for their country.

Choose England, Wales or Scotland in Settings, or change it on any certificate. The page prints the steps below, with the regulation they come from.

England

  • Give a copy of this report to each existing tenant within 28 days of the inspection.
  • Give a copy to the local housing authority within 7 days of a written request.
  • Make sure further investigative or remedial work is done within 28 days of the inspection, or sooner if the report says so.
  • Give the written confirmation of that work, with this report, to each tenant and the local housing authority within 28 days of the work being finished.
  • Give a copy to any new tenant before they move in, and keep a copy until the next inspection.

SI 2020/312, regulation 3

Wales

  • Give the contract holder a copy of this report within 14 days of the inspection.
  • Give a new contract holder the most recent report within 14 days of the occupation date.
  • Give the contract holder written confirmation of any investigatory or remedial work within 14 days of receiving it.

WSI 2022/6, regulation 6

Scotland

  • The landlord must be given a copy of this record and keep it for 6 years.

Housing (Scotland) Act 2006, section 19B

iCertifi Cloud Pro Teams

One choice for the whole firm.

In a Cloud Pro team, the firm owner chooses the sections and the landlord rules, and every engineer’s certificates use them.

  • Set once by the firm owner. Engineers see the owner’s choices in Settings, locked, and ask the owner for a change.
  • Filled in by each engineer. Each engineer fills the sections in on their own certificates, and can switch one off for a single job.
  • Qualifications stay personal. Each engineer keeps their own qualifications on their certificates.
Questions

About the Additional information page

Does the extra page change the official certificate?

No. The official BS 7671 pages print exactly as before. Additional information is a separate page after them, and Repairs done prints on the page after the Remedial Works Record’s own page.

Which certificates can have it?

EICR, EIC, Domestic EIC and Minor Works. Repairs done and Landlord next steps are for EICRs only. The 3 circuit Minor Works and other certificates never get the page.

Will my old certificates get the page?

No. Only certificates made after you first switch a section on get it, so a certificate you have already issued never changes.

Can I leave a section off one job?

Yes. On the certificate’s Additional information page, switch the section off and it is left off that certificate only. Switch it back on at any time.

What happens when I copy a certificate?

The copy is a new certificate. It gets the sections you have switched on now, and starts without the job no., the PO no., the repair links or the signed statement.

Which repairs are listed?

Every C1, C2 and FI observation on the EICR. C3 items are recommendations, so they are not listed. An item is done when its linked repair certificate has a completion date, or when you mark it Done by others.

Is it in iCertifi Cloud Pro too?

Yes, the same page. In a Cloud Pro team, the firm owner chooses the sections for every engineer.

Switch it on before your next EICR

Open Settings in iCertifi or iCertifi Cloud Pro, tap Additional information and choose your sections.

Download iCertifi on the App Store

iCertifi
Download iCertifi Cloud Pro on the App Store

iCertifi Cloud Pro

More about iCertifi ›   More about iCertifi Cloud Pro ›

Scroll to Top