BS 7671 Amendment 4 (2026) – What Electrical Contractors Need to Know

Another amendment, another book to buy. The Orange Book drops 15 April 2026 and replaces everything you have now. Here is what is actually changing, what you need to do, and the dates that matter.
Yes, you need to buy another book. BS 7671:2018+A4:2026 – the Orange Book – replaces the Brown Book, the Amendment 3 PDF bolt-on, and everything else. It rolls all previous amendments into one document and adds new chapters. The Brown Book you bought in 2022 will be withdrawn in October.
Amendment 3 was issued electronically in July 2024; Amendment 4 is a full printed edition with an orange cover. The changes are genuine though – new chapters on battery storage, Power over Ethernet and ICT earthing that did not exist before. If you install batteries, solar or smart home systems, this is not just paperwork.
Here is what is actually in it, when you need to have it, and what happens if you do not.
Key Dates
Published
15 April 2026
Can be used immediately for all new work from this date
Transition Period
6 months
Both the Brown Book and Orange Book valid during this window
Hard Cutoff
15 October 2026
Previous version withdrawn. Amendment 4 is the only current version
What the Orange Book Replaces
If you have been keeping up, you currently have two documents on the go: the Brown Book and the free Amendment 3 PDF. The Orange Book replaces both. One book, no more cross-referencing separate amendments.
On 15 October 2026 the previous version (BS 7671:2018+A2:2022+Corrigendum (May 2023)+A3:2024) is withdrawn, and the Orange Book is the current standard. What changes on 15 October 2026.
The Major Technical Changes
To be fair, this is not just a money grab. There are genuine new chapters covering things the regs have not addressed before. Here is what is actually changing.
What This Means for Your Qualifications
Here is the bit that costs you money and time. EAL has replaced its Level 3 Award (603/3298/0) with an Amendment 4 version (610/7005/1). Registrations on the old award closed on 31 July 2026, its exam is only available up to 15 October 2026, and its final certification date is 31 December 2026.
Important: If you are about to sit or resit your 18th Edition exam, check whether you will complete before the switchover date. There is no point qualifying against the current version if it is about to be superseded.
If you already hold the 18th Edition, ask your certification scheme and training provider what they expect from you for Amendment 4 before booking anything.
What You Should Do Now
1. Budget for the Orange Book. BS 7671:2018+A4:2026 is available from the IET Bookshop and authorised resellers from 15 April 2026. It is not optional – it replaces everything you currently have and your scheme provider will expect you to have it by October.
2. Book your CPD. If you already hold the 18th Edition qualification, look for Amendment 4 refresher courses from your scheme provider or training centre. Do this before October 2026.
3. Review your current battery and solar work. If you install battery storage systems, the new Chapter 57 will change how you approach location selection, isolation procedures and documentation. Start reviewing your methods now.
4. Check your PoE and ICT work. If you install structured cabling, smart home systems or PoE-powered devices alongside electrical work, the new sections on PoE and ICT earthing will apply to you.
5. Update your certificate forms. Amendment 4 introduces new test schedules for medical locations and bonding conductors. If you work in healthcare environments, your certificate templates will need updating.
6. Check what your scheme expects. Ask your certification scheme what it needs from you for Amendment 4, and keep your own qualifications current for the work you carry out.
Amendment History at a Glance
July 2018
BS 7671:2018 – 18th Edition Published
The current 18th Edition. Effective January 2019.
February 2020
Amendment 1 (Standalone)
Minor corrections and updates.
March 2022
Amendment 2 – The Brown Book
Issued 28 March 2022 with a brown cover. Changes included redrafted RCD and surge protection (Section 443) requirements and a new Chapter 82 on prosumer installations.
2024
Amendment 3
Issued electronically on 31 July 2024. Two new definitions and one new regulation on bidirectional and unidirectional protective devices.
15 April 2026
Amendment 4 – The Orange Book
Issued 15 April 2026 with an orange cover. Battery storage, PoE, ICT earthing, medical locations, energy efficiency, generating sets and a redrafted EICR. The previous version is withdrawn on 15 October 2026.
